[01 — SERVICES]
End-to-end piping and welding capability.
Six integrated capabilities. Single-discipline crews for welding support or full-scope teams for turnarounds and prefabrication campaigns.
- [COUNT]
- 6 CORE
- [STANDARDS]
- ISO 3834-2 · EN 13480 · PED
- [PROCESSES]
- 141 · 135 · 136 · 111 · 121
- [RANGE]
- DN25 — DN2000
- 01
Industrial Welding
TIG, MIG, and SMAW welding for process piping, pressure equipment, and structural elements. Carbon steel, stainless, duplex, and alloy materials.
[DN25–DN2000] [ISO 3834-2] [EN 1090-1] [EN 1090-2] [EN ISO 9606-1] - 02
Pipeline Installation
Full piping system installation — isometric fit-up, welding, pressure testing, and commissioning support. DN25 through DN2000.
[DN25–DN2000] [ISO 3834-2] [EN 13480] [EN 1090-2] [EN ISO 9606-1] - 03
Pipe Prefabrication
Off-site fabrication of pipe spools and welded assemblies. Reduces site exposure, improves QC, fits tight installation windows. DN25 through DN2000.
[DN25–DN2000] [ISO 3834-2] [EN 13480] [EN 1090-2] [EN ISO 9606-1] - 04
Maintenance & Turnarounds
Planned and emergency shutdown support for refineries, chemical plants, and paper mills. We integrate into existing turnaround programmes and deliver on tight outage windows.
[ISO 3834-2] [EN 13480] [ISO 45001] [EN 1090-2] - 05
Equipment Installation
Dismantling of obsolete units and installation of new process equipment with associated piping and tie-ins. Performed on operating facilities.
[ISO 3834-2] [EN 13480] [EN 1090-2] [ISO 45001] - 06
Heat Exchanger Services
Complete overhaul of shell-and-tube and plate heat exchangers — disassembly, inspection, welding restoration, and reassembly.
[ISO 3834-2] [EN 13480] [EN ISO 9606-1] [PED 2014/68/EU]
[GET STARTED]
Send us your scope.
WPS package, drawings, standards, and timeline. We respond within one business day.